API Stability & Deprecation Policy

This page states, for real consumers of Djangors (not just internal contributors), what compatibility guarantee the project makes, how it changes public APIs, and how it ships releases. It exists because none of this was published anywhere discoverable before. The intent lived only in internal planning notes.

Versioning

Djangors follows Semantic Versioning starting at 1.0.0. All workspace crates (djangors, djangors-core, djangors-orm, djangors-rest, and the rest) share a single version number via the workspace’s [workspace.package] version, and are released together. You will never see djangors-orm at 1.3.0 while djangors-core is at 1.1.0. Before 1.0, expect breaking changes between minor (0.x) releases without a deprecation cycle; the guarantees below apply from 1.0 onward.

What “the public API” means: as of the first API-freeze review, this covers djangors-core, djangors-orm, and djangors-rest (audited together as the largest and most-depended-on surface). The djangors facade crate (djangors::core, djangors::orm, djangors::rest, etc.) re-exports these and is the intended single entry point for applications. Coverage of the remaining crates (djangors-admin, djangors-auth, djangors-forms, and the rest) is an explicitly planned follow-up (“Freeze Review Pass 2”), not yet frozen under this policy.

Deprecation mechanics

  • A public item slated for removal is marked #[deprecated(since = "X.Y.Z", note = "...")] with a note explaining the replacement or reason.
  • It remains functional, with the deprecation warning, for at least one full minor release cycle before it can be removed in a subsequent minor or major release. It is never removed in the same release it was deprecated in.
  • Every release with deprecations or removals lists them explicitly under their own “Deprecated” and “Removed” headings in CHANGELOG.md (see below), not buried in a generic changelog paragraph.

CHANGELOG.md

A root CHANGELOG.md is maintained today, grouped by development phase since there has not yet been a tagged 1.0 release. Once 1.0 ships, it switches to the Keep a Changelog format: Added/Changed/Deprecated/Removed/Fixed/Security sections per version.

Release cadence

A tagged release ships roughly every 4-6 weeks, each with a changelog entry. This is not a new commitment invented for this doc. It restates a cadence the project has intended internally since early planning (PLAN.md’s own “Project operations” section); this page makes it visible to actual consumers rather than leaving it as an internal note.

Changing the public API

Any change to the public API surface at or above “medium” impact (renaming or removing a public item, changing a trait’s required methods, changing a function’s signature in a way existing callers must adapt to) goes through a short RFC first: a design doc under docs/design/ describing the change and its motivation, open for comment before landing. This mirrors the process already used internally for every architecturally significant change in this project’s own history (every slice in docs/design/ is exactly this kind of doc). Formalizing it here means outside contributors can propose and review API changes the same way, not just watch them happen.

Where this stops short today

This is a first pass, not a complete stability contract: it covers 3 of the 32 workspace crates by design (the largest, most-used ones), and doesn’t cover the contrib crates or CLI tooling at all. Treat this page as the honest current state of the policy, not a claim that everything is frozen. It will be extended as later freeze-review passes land.